Back to top

Work Packages

By means of exchanging information about specific background and experience of all partners concerning the issue of the project, a logic and rational allocation of roles has been possible. All members of the partnership have raised the key elements of the previous projects; they had worked in as an appropriate basis to define their potential role in the project. Partners have suggested or proposed particular approaches to their involvement, which have been finally agreed after a joint discussion. A set of work packages have been developed by the consortium to achieve the objectives of the  project, these are:

  • WP1 Project coordination
  • WP2 Project Communication
  • WP3 Capitalization
  • WP4 Identifying industry needs and detection methods
  • WP5 Joint Design of an Easy-to-Use Toxicity Alert System
  • WP6 Industrial Pilot of the Toxicity Alert System